• MAZALIJ & ABU JIFAN PIPELINES-KHURAIS AL CRUDE INCREMENT PROJECT

    Detail Engineering Design with procurement of 12”, 16” & 18” diameter approximately 245 KM long stars from Mazalij Gas plant towards Abu Jifan with complete internal and external FBE Coating. Major scope is to construct the ROW along the pipe line, construction of pipe lines of different sizes, RTR coating, 8 valve station, burn pits, scrapper traps, Corrosion inhibitor skids, cp system initializing, overhead transmission lines, 100% RT, six (6) thrust bore road crossing.

    Client: Saudi Aramco

    Location: Mazalij & Abu Jifan


  • MASTER GAS SYSTEM PHASE II PACKAGE I WESTERN REGION PIPE LINE

    Detail Engineering Design , Procurement, Construction of 422 KM 56” under ground Pipe line Start From Pump station 07 near Riyadh to Pump station 11 near Madina. Major Scope is to Construct the ROW along the Pipe line, Construction of Pipe line, 21 Valve station, Burn Pits, Black Powder Filtration System, Corrosion inhibitor Skids, eleven (11) Thrust Bore Road Crossing.

    Client: Saudi Aramco

    Location: Western Region


  • MASTER GAS SYSTEM PHASE II PACKAGE II CENTRAL REGION PIPE LINE

    Detail Engineering Design , Procurement, Construction of 226 KM 46” under ground Pipe line Start From Pump station 06 near Riyadh to Qassim Power Plant. The pipeline will be paralleled to existing AYQS-1 pipeline Major Scope is to Construct the ROW along the Pipe line, Construction of Pipe line, 7 Valve station, Burn Pits, Black Powder Filtration System, Corrosion inhibitor Skids, Seven (7) Thrust Bore/ Open Cut Road Crossing.

    Client: Saudi Aramco

    Location: Central Region


  • MASTER GAS SYSTEM PHASE II PACKAGE III EASTERN REGION PIPE LINE

    Detail Engineering Design , Procurement, 56” Diameter Approximately 150 KM long from EWPS # 1 to BGCS#3 for SRG-3 and another 56” Diameter Approximately 40 KM Long from BGCS#3 to KM 245.2 for SRG-2 SEC III. Major Scope is to Construct the ROW along the Pipe line, Construction of Pipe line, 10 Valve station, Burn Pits, Black Powder Filtration System, Corrosion inhibitor Skids, Ten (10) Thrust Bore/ Open Cut Road Crossing

    Client: Saudi Aramco

    Location: Eastern Region


  • FADHILI DOWNSTREAM PIPE LINE

    Detail Engineering Design , Procurement, 56” Diameter Approximately 34 KM long start from Wasit Gas plant toward fadhili and 204 KM 56” Pipe line from Fadhili Gas Plant to EWPS 01, 40 KM 18” Utility Water Pipe line from Fahili Plan to Wasit Plant & 4” x22KM HDO Pipe line. Major Scope is to Construct the ROW along the Pipe line, Construction of Pipe line, 8 Valve station, Burn Pits, Corrosion inhibitor Skids, Six (6) Thrust Bore Road Crossing.

    Client: Saudi Aramco

    Location: Fadhili


  • ONSHORE MAINTAIN POTENTIAL PROGRAM FOR NA-1B

    Construction of all phases of well head sites including flow lines, trunk lines, laterals, manifolds. Transfer lines, water injection lines and test and production lines. Contractor shall construct Overhead Power Line, upgrade Supervisory Control and Data Acquisition (SCADA), Remote Terminal Units (RTU’s) fiber optic cable, optical transmission equipment, Ethernet switches, and other WORK directed by Saudi Aramco

    Client: Saudi Aramco

    Location: Northern Region


  • ONSHORE MAINTAIN POTENTIAL PROGRAM FOR NA-2

    Construction of all phases of well head sites including flow lines, trunk lines, laterals, manifolds. transfer lines, water injection lines and test and production lines. Contractor shall construct Overhead Power Line, upgrade Supervisory Control and Data Acquisition (SCADA), Remote Terminal Units (RTU’s) fiber optic cable, optical transmission equipment, Ethernet switches, and other WORK directed by Saudi Aramco.

    Client: Saudi Aramco

    Location: Northern Region


  • DAYLIGHTING PHASE III

    In-Plant Daylighting of five (5) pipelines laterals in Northern Area, eight (8) pipeline laterals in Southern Area and three (3) pipeline laterals in East-West Area. The existing pipelines laterals will be replaced with new above ground lateral pipes, all the work is being carried inside live plants and includes shutdown.

    Client: Saudi Aramco

    Location: Southern Region


  • NEW FIRE STATION AND TWO ASL CRUDE LOADING BAYS, WASEA

    EPC for Two ASL crude oil loading bays. Scope includes the procurement of special mechanical equipment such as vertical pumps, truck loading arms, foam skids, MOV’s, ZV’s, etc. Installation includes 7 km of underground RTR pipe installation and 75,000 inch dia. of plant piping welding.

    Client: Saudi Aramco

    Location: Wasea


  • AL KHAIR POWER AND DESALINATION PLANT

    Construction and procurement for six tanks, 170,000 m3 each, including pipelines and utilities and infrastructure and related systems.

    Client: Marafiq

    Location: Ras Al Khair


  • JESCO SEAMLESS PIPE PLANT

    Plant and In-Plant Work scope included Main Production Plant, Electrical Sub-Station, Electrical Control Buildings, Main Plant Control Pull Pit Building, Water Treatment Plants, Hydraulic Rooms, Non-Process Buildings.

    Client: JESCO

    Location: Jubail


  • EPC OF JIC COOLING PLANT

    CEEPC for offsite pipelines and onsite Works, Chilled Water Generation Plant and TSE Tertiary Treatment Plant. The scope includes all the required engineering and design work as well as procurement of mechanical and electrical equipment.

    Client: Royal Commission of Jubail & Yanbu

    Location: Jubail


  • SHUAIBAH III IWPP – TANKS

    EPC - Design, Procurement and Construction of Tank Farms along with all the associated Pipelines, Infrastructure and Utilities.

    Client: Saudi Aramco

    Location: Shuibah


  • MARAFIQ IWPP 1 PROJECT IN JUBAIL

    EPC - Design, Procurement and Construction of Tank Farms along with all the associated Pipelines, Infrastructure and Utilities. The Work includes all the Civil, Electrical, Mechanical and Instrumentation Work.

    Client: Marafiq

    Location: Jubail


  • IMPORT/EXPORT PIPING WORKS IN TASNEE

    Construction of all phases of well head sites including flow line.

    Client: Tasnee

    Location: Jubail


  • PIPELINE CORRIDOR UPGRADE WITH CORROSION PROTECTION

    In-Plant work for Pipeline upgrade with corrosion protection – repair, replace, expansion, box culvert and fire water system. The work includes procurement activities as long as installation and construction.

    Client: Royal Commission of Jubail & Yanbu

    Location: Jubail


  • SAMCO ACRYLIC ACID PROJECT IN JUBAIL

    Civil, Mechanical, Electrical and Instrumentation Work. The Project is to fulfill all the In-Plant work for the Acrylic Acid Facility including the Piping work and Process Facilities.

    Client: SAMCO

    Location: Jubail


  • CORROSION PROTECTION PROJECT

    In-Plant Corrosion Protection project for Pipelines, Utility Culvert, Box Culvert, Bypass of Utilities, Fire lines, Utility Chambers, 4-6-8 Utility Culverts, Existing Utilities for Water, Power, and Feedstock etc.

    Client: Royal Commission of Jubail & Yanbu

    Location: Jubail


Top